
John Day Dam
![]()
Location: River Mile 215.6 on the Columbia River in HUC 17060105
Operated by: United States Army Corp of Engineers, Portland District
Link: https://www.nwp.usace.army.mil/op/d/johnday.asp2010 Smolt Monitoring
Dates: April 1 to September 15
Sampling conducted by: Pacific States Marine Fisheries Commission.
Project Leader: Greg Kovalchuk, Rick MartinsonMore information can be found at the John Day/Bonneville Smolt Monitoring Web Page
Passage index formula
1999 to present: (collection count)/((average(COE turbine discharge/(COE turbine discharge + total spill)))) 1998: (collection count)/((average(COE turbine discharge/(COE turbine discharge + COE total spill)))) 1997 to 1987: (collection count)/((average(UNIT 3 flow/(COE turbine discharge + total spill)))) 1986: (collection count)/((average(UNIT 3 flow/(COE turbine discharge + UNIT 3 + total spill)))) 1985: (collection count)/((average(UNIT 3 flow/(river flow + total spill)))) Traditional Adult Return Reporting Dates
April 1 to October 31
![]()
Page last updated on: January 30, 2010
This website designed for 1024 x 768 or higher resolution. Questions and comments to: webmaster@fpc.org
[ Home ] [ Adult ] [ Smolt ] [ Spawning ] [ River ] [ Hatchery] [ Survival] [ Travel times] [ Documents ]


